- Ann Arbor Public Schools
- Facility Condition Assessment Reports
Physical Properties & Capital Programs
Page Navigation
Facility Condition Assessment Reports
-
In 2018 AAPS commissioned a district-wide Facility Condition Assessment (FCA)- EMG Corporation was awarded a contract to conduct the FCA.
- FCA is life cycle engineering analysis of the condition of a facility in terms of age, design, construction methods, and materials.
- The analysis is done by walk-through inspection and mathematical modeling. It includes calculations of useful life and conditions of building systems and equipment.
- The FCA identifies needed infrastructure investments and risks associated with continued deferral of maintenance and replacement investments.
FCA Executive Summary - December 2018
Individual Facility Reports
- EMG Corporation was awarded a contract to conduct the FCA.
-
A2 Open @ Mack
Mack Elementary Open School_129010.18R000-018.354Text2_Final2.pdf 2.94 MB (Last Modified on October 25, 2019)
-
Forsythe MS
Forsythe Middle School_129010.18R000-027.354Text2_Final2.pdf 1.84 MB (Last Modified on October 25, 2019) -
Slauson MS
Slauson Middle School_129010.18R000-028.354Text2_Final2.pdf 2.33 MB (Last Modified on October 25, 2019) -
Tappan MS
Tappan Middle School_129010.18R000-029.354Text2_Final2.pdf 2.35 MB (Last Modified on October 25, 2019)
-
Huron HS
HuronHS_Field_2TicketBuildings_129010.18R000-034.354Text4_Final2.pdf 4.35 MB (Last Modified on October 25, 2019) -
Pathways HS
A2 Tech-Stone-Pathways_129010.18R000-030.354Text2_Final.pdf 2.91 MB (Last Modified on July 26, 2019) -
Pioneer HS
PioneerHS_Baseball_FieldHouse_Grounds_129010.18R000-035.354Text2_Final.pdf 2.14 MB (Last Modified on July 26, 2019) -
Skyline HS
Skyline Highschool_129010.18R000-025.354Text4_Final2.pdf 4.09 MB (Last Modified on October 25, 2019)
-
Balas Administration Building
Balas Administration Building_129010.18R000-031.354Text2_Final.pdf 2.68 MB (Last Modified on July 26, 2019) -
Transportation Facility
Transportation_2 Storage Buildings_129010.18R000-033.354Text2_Final.pdf 2.67 MB (Last Modified on July 26, 2019) -
Westerman Preschool
Preschool_Family Center_Balas II_III_129010.18R000-032.354Text2_Final.pdf 3.53 MB (Last Modified on July 26, 2019)